Lower Bluffwalk Phase 2
The Lower Bluffwalk Phase 2, project is a proposed pedestrian street located between the buildings that face Jefferson and Commerce Streets. The walkway will create opportunities for an entirely new environment for the existing and proposed buildings along its path. It is envisioned to be a spine for a new, mixed use cultural district with new galleries, shops, cafes, courtyards and overlooks.
The goal is to build the balance of the bluffwalk in this project to the extent possible with available funding, focusing on supporting the current momentum of private development and creating links to active public places that provide routes to the riverfront area.
| City of Lynchburg Representatives | ||
|---|---|---|
| Principle Designer(s) | Nelson, Byrd, Woltz Landscape Architects | 434-984-1358 |
| Kennon Williams Landscape Architects | 434-989-4456 | |
| Secondary Designer(s) | Greening Urban | 804-217-7436 |
| DMPWV Structural Engineers | 434-295-5171 | |
| Wiley-Wilson | 434-947-1601 | |
| Masters Engineers and Designers, Inc. | 434-846-1350 | |
| Gilmore Lighting Design | 301-907-7575 | |
| Hydro Dramatics | 314-231-9806 | |
| Construction Manager | Charles Grant | 434-455-3934 |
| Project Manager | Cheree Taylor | 434-455-4451 |
| Construction Inspector | Derick Custis | 434-455-4253 |
| General Contractor | Coleman-Adams Construction, Inc. | 434-525-4700 |
| Current Posted Projects | |
|---|---|
| 2012 Bridge Maintenance Project | Lower Bluff Walk Phases II & III |
| Bridge Safety Inspections | Main Street Bridge Rehabilitation |
| Fifth Street Phase II | McConville Road Culvert |
| Jefferson Street South / Lower Bluff Walk Phase I | Rivermont Avenue Bridge |
| Kemper Street Bridge | Wards Road Bridge Improvements |
| Lakeside Dr. / Park Ave. / Memorial Ave. Intersection | |
"Working Together to Serve You Better!"